The project entailed rehabilitating the road and attending to storm water drainage system. The summarized project details are as follows:
   VUBA       
   IMAGINEERS
     Engineering,
   Geographic Information System
& Project Management Consultants

     Storm Water Systems....

Repair of Slip Circle Failure on Route R392
Client: Newcastle Municipality
Cost: R13 000 000
Elements: 12 m wide and 650m long
street, layer works comprising subbase, base course and 40mm hot asphalt, 1200m of storm water piping from 600mm diameter to 1500 mm diameter.
Completed: December 2011
River Bank Protection in Umzinto
The project entailed designing a durable and safe river bank protection following the deadly floods of June 2008. The summarized project details are as follows:
Client: Mafahleni Engineers
Cost: R12 000 000
Elements: 12 000 m3 of gabions.
Completed: May 2010
FEATURES
Water Supply Systems
Sewer Systems
Pavements
Storm Water Systems
Buiding Works
 Projects > Storm Water Systems
imagineers2013005.gif imagineers2013004.gif imagineers2013003.gif imagineers2013002.gif imagineers2013001.gif
Water Supply Systems
Sewer Systems
Pavements
Storm Water Systems
Building Works
2017 Vuba Imagineers 
Project Management
Geo-Environmental
Water Resources
Pavement Engineering
G.I.S
Structural Engineering
Storm Water
1
2
3
 4
5